Sector: Education

Oasis Wintringham Academy

  • Location: Grimsby
  • Client: Oasis Community Learning Projects Ltd
  • Duration: 69 Weeks
  • Consultants: Watson Batty, HBPW, NG Bailey
Oasis Academy Wintringham

A 900 place design and build secondary school constructed under the academy programme. Clugston are members of Oasis’ framework to construct up to 10 academies. Careful development of the concept design ensured that the critical acoustic, thermal, natural ventilation and natural daylight parameters were met by the team.

A 900 place design and build secondary school constructed under the academy programme. Clugston are members of Oasis’ framework to construct up to 10 academies. Careful development of the concept design ensured that the critical acoustic, thermal, natural ventilation and natural daylight parameters were met by the team.

The academy has a sports specialism and includes a sports hall with a sprung timber floor, a fitness suite, dance studio and a 400m running track with an artificial surface cricket square. To allow extended use of the external facilities by the community, in addition to the internal facilities, the full size artificial surface football pitch and 4 court Multi Use Games Area (MUGA) are floodlit and fully fenced to a height of three metres.

The project included the construction of 5 new science laboratories, 2 preparation rooms, 2 chemical stores and 1 general science store. Within the laboratories is a mix of fixed and mobile fume cupboards.

It also includes electronic security measures in the form of access control and CCTV. The Building Management System is linked into the control systems and ICT cabling and containment was installed. All Fixtures, Fittings and Equipment were also include within the project scope.

The academy features stainless steel ‘Rimex’ cladding to the internal piazza elevations which also creates a cloister area that contributes to the solar shading regime. The Rimex cladding also shades the double height ‘agora’ area that will also be used for dining. Other external treatments include brickwork, stone render and curtain walling to the academy entrance area. Standing seam and flat roofing complete the elevational treatment. A piazza, bordered on three sides by the building forms a central focal point and includes feature paving, benches and tree planting to create a calm area for students to gather and socialise.